Day 24 – Concrete poured

July 14, 2010

The wall next to the house with bracing

July 13, 2010 – The forms, which had final touches done to them this morning, were filled with concrete. By early afternoon, the work was finished. All-in-all, it’s about what’s you’d expect it to look like: lot’s o’ concrete.

As we’ve touched on in prior posts, our basement walls would be susceptible to cracking with the weight of the curing concrete outside, so those were braced with an interesting network of  vertical and horizontal braces.

I’m not quite sure how long the curing takes. It’s a tall wall in places, and while our footings took about 24 hours to set, these could take longer. We’ll see if anyone shows tomorrow – check the web cam!

Web of wood in the basement bracing the wall

Advertisements

From → Concrete, Foundation

One Comment

Trackbacks & Pingbacks

  1. Making Cool Shelving from Lemons « Our RemodoBlog

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s