Day 28 – We’re floored

July 17, 2010

July 17, 2010 – We’ve got floor joists! The boards were put down at the end of this week, with the floor really taking shape. The vapor barrier was also laid in the crawlspace area. The work is put on hold Friday until the inspector shows up to okay the work (apparently, the city is a little backed up).

From → Framing