July 26, 2011 – It’s been awhile since our last post, so this will be a quick update as to what’s been happening. Since our last update, we’ve:

  1. Installed trim for the new front door and caulked
  2. Stained, and applied two coats of gloss to front door
  3. Moved house numbers to new location under porch light
  4. Reorientated porch light
  5. Repainted and hung mailbox
  6. Got most of the under porch area sided
  7. Began repairing the interior damage to the lath and plaster done on the door install
  8. Had work on the plumbing commence.

First, here’s some shots of the new door, trim and siding. In addition to the mailbox being hung (you have no idea how nice it is to be able to attach a mailbox back on our house!) we also painted the bracket that holds the house numbers. Black is the new white, don’t you know…

Current front porch look

The plumbing also began, and they’ve been at work for a few days now. It’s nearly done, with the lines pressurized for the first time today. We haven’t had inspection on any of the interior work yet, but the plumbers still have to make a few connections for the shower and toilet on the first floor, as well as run the venting to the roof. The hot and cold lines are being run with pex tubing.

First floor bath (minus the pex plumbing)

Upstairs rough-in for two sinks

Pex as it makes the transition from the basement to the new addition

Advertisements

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s