Day 405 – City inspection approves our rough plumbing

July 29, 2011

July 29, 2011 – Today we got inspection and approval of our rough plumbing. Yea! This is really a huge milestone for us, because after this, we’re so much closer to getting done. We can now run electrical, get inspection on that plus our framing, and then finish up the mechanical (install ducting for bath fans). Insulation and drywall are within our reach!

The inspector was the same we’ve had for all our other work, and he’s a great guy that seems very willing to help with questions.

Now, we need to get the plumber back out to finish flashing around the vent line that goes through the roof (it’s just a hole now); insulate the pipes; and install the cleanout on the exterior sewer line. We will then be able to fill in the last trench outside and resume our yard to a “normal” appearance.

We still have siding to complete, but we also need to think about the placement of our electrical – plugs and lights and so forth. We’ve done so trips to lighting stores to get ideas, but even without the fixtures picked out, we need to get serious with placement.

Onwards and upwards!

Advertisements

From → plumbing

Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s