Day 653 – Play structure complete, electrical nearly done

April 9, 2012

April 9, 2012 – Just in time for the very Spring-like weather we’ve been having, our play structure is up for our children. A slide, swing and rock climbing wall has kept them very busy.  It fits very nicely behind the garage too, without owning too much of the yard.

Play structure (dog not included)

The electrical is nearly done as well. We’ve gotten both of the bath fans installed, and connected to ducting. The fans are a very cool Broan model QTXE110SFLT that we use in our current bathroom, and feature a humidity sensing on/off feature. When the humidity rises, the fan turns on. After a preset period, it turns off. No forgetting to turn the fan on or off! It mounts on a rail system that allows some freedom in placement. Due to the oddities of the upstairs bath and the pitch of the roof, we had to mount the fan transverse to the space to allow the ducting to run without to0 many bends.

Upstairs bath van venting through roof

Hopefully we’ll be getting the electrical wrapped up this week.

Advertisements

From → Bathroom

Leave a Comment

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out / Change )

Twitter picture

You are commenting using your Twitter account. Log Out / Change )

Facebook photo

You are commenting using your Facebook account. Log Out / Change )

Google+ photo

You are commenting using your Google+ account. Log Out / Change )

Connecting to %s